Progressing a Load With Check Calls

MVMNT will automatically fill the check call event type based on the current status of the load and the next step in the life of the load. 

In this example, I will go through the entire life of this load updated via the check call logging:

 

-This load is in Dispatched status, the next check call has defaulted to ‘arrived at pickup’ to allow users to enter an in time 

Log Call PU arrival

-You can see the status progression that will happen as a result of this completed action next to the even type 

Log Call PU arrival status

-Enter the arrival date and time

Log Call PU arrival in times

-Add your next check call date and time.

Log Call PU arrival next check

-Log the check call to progress the load.

           -Notice that the arrival time is now logged in your stop as well

Check Call loading

Check Call loading in time


-Repeat the process above to progress the load from Loading to In Transit

 

-Click the Log Check call button to bring up the modal

check call loading to trans

-You will see Departed Pickup as the next Event Type

check call loading to trans status

-Add in the departure date and time you receive from your update

check call loading to trans out time

-Go and add the next check call date and time that you’d like

check call loading to trans next

-Click Log Check call to now progress the load to In Transit

          -See out time now recorded as well for the Pickup Stop

Check call in trans

Check call in trans out time

 

-Repeat this process for arrival and departure at the consignee until the load is delivered.